The modernization included the renovation of the 50-meter pool basin, the grandstand and the canopy. In addition, a 25-meter warm-up pool was built with six lanes and a movable bottom on one half, allowing for adjustable water depth. The swimming pool is enriched with a recreational section including a paddling pool, a wellness zone and external slides 60 and 100 m long.

Implementation period: August 2015 – September 2017